Local officials in Samangan province stated that, to enhance transport infrastructure and reduce natural hazards, the construction of two retaining walls has begun at a cost of 21,237,000 Afghanis.
According to the officials, these retaining walls will be built in the Trashkurghan Tangi and Golai Sayad areas of Khulm district, measuring 180 meters in length and 7.28 meters in width.