Close Menu
HindukushHindukush

    Subscribe to our free email newsletter

    free newsletter

    Facebook X (Twitter) WhatsApp Telegram
    HindukushHindukush
    • Home
    • News
      • News Bulletin
      • Afghanistan
      • Region
      • Middle East
      • World
    • Commentaries
    • Articles
      • Religious Articles
      • Important Articles
      • Political Articles
      • Selected Articles
    • Global Media
    • Secret
    • Clarification
    • Dark Faces
    • Videos
    • English
      • دری
      • پښتو
    Facebook X (Twitter) WhatsApp Telegram
    HindukushHindukush
    You are at:Home»Afghanistan»Economic Directorate of the Prime Minister’s Office: Feasibility Studies for Water Dams to Begin in Several Provinces in 1404
    Afghanistan

    Economic Directorate of the Prime Minister’s Office: Feasibility Studies for Water Dams to Begin in Several Provinces in 1404

    Abdul Zaher HeraveeAbdul Zaher Heravee29 March 2025No Comments1 Min Read
    نشر Facebook Twitter Telegram WhatsApp
    Share
    Facebook Twitter Email Telegram WhatsApp

    The Economic Directorate of the Prime Minister’s Office has announced that feasibility studies for the construction of water dams will commence in several provinces during the 1404 solar year.

    According to a press release from the Economic Directorate, the Ministry of Water and Energy presented several projects for discussion at the latest periodic meeting of the Economic Commission, chaired by Deputy Prime Minister Mawlawi Abdul Ghani Baradar.

    These projects included the feasibility studies for the Gurumbi Dam in Maidan Wardak, the Qarateeri Dam in Balkh, the Shna Nari Dam in Kandahar, and the Wach Nari Dam in Paktia. After thorough evaluation, it was decided to include these projects in the budget for the 1404 fiscal year.

    The meeting also addressed other important issues, such as the construction of the Kandahar Bypass Road, the Arghistan Dam, the extension of a 90-kilometer electricity transmission line from Kabul to Jalalabad, and the completion of the Sheikh Misri Substation in Jalalabad.

    It is important to note that since the return of the interim government, hundreds of projects have been launched across the country to ensure balanced development.

    Previous ArticlePalestinian Health Ministry: 24 Martyred in Latest Attacks by the Zionist Regime on Gaza
    Next Article Economic Directorate of the Prime Minister’s Office: Feasibility Studies for Water Dams to Begin in Several Provinces in 1404

    Related Posts

    A Cold Storage Facility Built with 30 Million Dollar Investment in Kabul and Put into Operation

    18 January 2026

    Deputy Minister of Industry and Commerce Travels to Bangladesh Accompanied by National Traders

    18 January 2026

    Power Supply Project Begins for 14 Water Pumps in Jalalabad

    17 January 2026
    Leave A Reply Cancel Reply

    New Posts

    Bangladeshi ‘CSL’ Company Shows Interest in Investing in ‘Net Metering’ in Afghanistan

    10 January 2025

    Pakistani Taliban Announce “Al-Khandaq Operations” for Spring 2025

    14 March 2025

    The Pakistani Taliban have conditionally released three employees of the Pakistani military and intelligence agency

    31 December 2024

    Over 500 Sheep Smuggling Attempt to Pakistan Foiled in Kandahar

    6 October 2025
    Important News
    World 18 January 2026

    Trump Threatens to Impose Tariffs on Eight European Countries Over Greenland Dispute

    Reuters reported that US President Donald Trump said he would keep higher tariffs on imports…

    International Media: Trump Demands One Billion Dollars from Each Country for Permanent Membership in the Gaza Peace Board

    18 January 2026

    A Cold Storage Facility Built with 30 Million Dollar Investment in Kabul and Put into Operation

    18 January 2026
    Follow US
    • Facebook
    • WhatsApp
    • Twitter
    • Telegram
    Most Viewed
    About US
    Facebook X (Twitter) WhatsApp Telegram
    Our Choice

    Trump Threatens to Impose Tariffs on Eight European Countries Over Greenland Dispute

    18 January 2026

    International Media: Trump Demands One Billion Dollars from Each Country for Permanent Membership in the Gaza Peace Board

    18 January 2026

    A Cold Storage Facility Built with 30 Million Dollar Investment in Kabul and Put into Operation

    18 January 2026
    Most Popular

    Bangladeshi ‘CSL’ Company Shows Interest in Investing in ‘Net Metering’ in Afghanistan

    10 January 202584 Views

    Pakistani Taliban Announce “Al-Khandaq Operations” for Spring 2025

    14 March 202563 Views

    The Pakistani Taliban have conditionally released three employees of the Pakistani military and intelligence agency

    31 December 202451 Views
    © 2026 All rights reserved.
    • Home

    Type above and press Enter to search. Press Esc to cancel.